The flooded areas depends on the manometric height of the dam 30m (415-383) 35m (420-383) 40m (425-383) 45m (430-383) (made by Yves Malongo)
(40m seems the best, the flooded area near Kisangani upstream of the dam can be limited by the construction of a dike)
The local enhancement of the iron deposit will finance the development of the
whole Province
OPTION OF A SINGLE DAM AND A LARGE RESERVOIR LAKE
OPTION OF 3 DAMS
2000MW HYDROELECTRICAL DAM IN WANIE RUKULA hydroelectrical
Between
Kisangani
and
Ubundu,
the
river's
elevation
change
is
37m,
with
a
flow
rate
of
6180m³/sec;
the
available power, assuming a 90% energy efficiency, is 2000MW
Power of the hydroelectric dam : 2000MW
D Kisangani
6180 m3/sec
downstream level 383 m
upstream level
420 m
H
37 m
P = D*H*9.81/1000 MW
2242 MW
energy efficiency (
ρ
)
90%
P*
ρ
2018 MW
Depending
on
the
river
profile,
three
dams
can
be
built
at
the
three
major
elevation
changes
of
the
river
or
a
single
large
dam
is
likely
to
take
advantage
of
the
37m
elevation
change
by
creating
a
large
reservoir
between
Kisangani and Ubundu.
•
An hydroelectric dam (or 3 dams) will be built to produce 2000MW
•
This dam will connect the two banks of the rivers by a road and a railway.
•
The river Congo & Lualaba between Kisangani and Kindu,will be navigable
•
A steel plant will be built along the river to reduce iron ore:
o
by DRI/H2 with hydrogen produced by electrolysis;
o
by DRI/CH4 with gas from Lake Kivu.
•
The steel produced will be transported by barge down the Congo River
•
Rehabilitation of the Kisangani cement plant
OTHER PROJECTS
AVAILABLE POWER