PROJECT TO EXPORT 50Mt PER YEAR OF HIGH-GRADE IRON ORE
Investments in infrastructure secured by the very high-grade Banalia iron ore deposit which has already been surface prospected in 1974. This iron deposit was to supply the Maluku steelworks which was a failure because of its very poor location. Surface prospecting was carried out by the Italian and Belgian companies SICAI/TRACTIONNEL, cf http://www.thaurfin.com/SICAI.pdf The prospecting results have been entered into the Excel file published on http://www.thaurfin.com/SICAI-TRACTIONNEL.xlsx According to a surface survey of a sedimentary deposit sloping at approximately 60° which has formed hills, and extrapolated to a depth of only 70m, the resources would be969Mt@65.55%Fe The results of this survey were discussed at this URL : https://thaurfin.com/Iron-deposit.pdf
Geological prospecting
Logistic
PROJECT TO EXPORT 50Mt PER YEAR OF HIGH-GRADE IRON ORE
Geological prospecting
Investments in infrastructure secured by the very high-grade Banalia iron ore deposit which has already been surface prospected in 1974. This iron deposit was to supply the Maluku steelworks which was a failure because of its very poor location. Surface prospecting was carried out by the Italian and Belgian companies SICAI/TRACTIONNEL, The prospecting results have been entered into this Excel file According to a surface survey of a sedimentary deposit sloping at approximately 60° which has formed hills, and extrapolated to a depth of only 70m, the resources would be 969Mt@65.55%Fe The results of this survey were discussed at this URL : https://thaurfin.com/Iron-deposit.pdf
Logistic
The value of iron ore is often contingent upon its logistics. h  t  t  p  s  :  /  /  w  w  w .  l  a  t  r  i  b  u  n  e  .  f  r  /  a  r  t  i  c  l  e  /  a  f  r  i  q  u  e  /  3  3  3  8  7  2  1  6  3  8  2  5  8  2  /  f  a  c  e  -  a  -  l  a  -  p  o  u  s  s  e  e  -  a  m  e  r  i  c  a  i  n  e  - pekin-s-engage-sur-un-projet-de-fer-strategique-pour-la-rdc Thaurfin Ltd, holder of 3PRs 1323, 1324 & 1325, proposes to transport 50Mt per year by river down the Congo River, h t t  p s  :  /  /  l  e  p  o  i  n t  .  c  d  /  m  i  n  e  s  -  e  n  -  r d  c  -  t  h  a  u  r  f  i  n  -  d  e f e  n  d  -  l  a  - v a  l  i  d  i  t e  -  d  e  -  s  e  s  -  p  e  r  m  i  s  -  s  u  r -  l  e  -  g  i  s  e  m  e  n t -  d  e  - banalia/